Jumeirah Carlton Tower – Bronze Restoration and Refinishing
London, England

Project Overview
Bespoke Patination was appointed to carry out a comprehensive bronze refinishing project across multiple areas of the prestigious Jumeirah Carlton Tower in London.
The works included the refinishing of bronze profiles throughout the hotel, the full restoration of the handrail leading to the Peak Fitness Club and Spa, and the restoration of bronze balustrades within the pool area.
Our aim was to reinstate the metalwork to the hotel’s refined brown-bronze tone, ensuring all restored surfaces aligned seamlessly with the brand’s visual identity and luxury aesthetic.
| Duration | Approximately 1–2 weeks total works |
|---|---|
| Finish Achieved | Brown Bronze tone consistent with Jumeirah Carlton Tower’s brand colours |
| Client Satisfaction | Yes – the client was highly satisfied and invited us back for additional touch-ups when needed |
| Team Involved | Antony, Imhammed, Ryan, Wojciech, Absalam |
Craftsmanship and Materials
The restoration involved a combination of Bronze Solutions, professional applicators, hand tools, abrasives, and Renaissance wax.
Each surface was individually assessed to determine whether a complete strip and refinish was required or if cleaning and re-waxing would be sufficient for stable areas.
This bespoke approach ensured that every detail—from the prominent lobby handrails to the intricate poolside balustrades—was treated with precision, care, and respect for the original design intent.

On-Site Challenges & Considerations
As the hotel remained fully operational throughout the project, strict attention was given to maintaining a clean, safe, and discreet workspace.
Our operatives worked closely with the hotel management team to schedule activity around guest movement and daily operations.
The pool area presented a unique challenge due to its warm and humid environment, requiring careful control of materials and finishing times to achieve a consistent result.
Despite these complexities, our team delivered the works on time and to the highest standard.
What the Client Said
Although no formal testimonial was provided, the engineering and management teams expressed full satisfaction with the quality of the completed work.
They later re-engaged Bespoke Patination for additional snagging and maintenance tasks in the same areas, reflecting their continued confidence in our service and results.

Final Result & Special Notes
This project highlighted our ability to deliver precise metal restoration within an active five-star hotel environment.
Working during both the fit-out and post-opening phases, we ensured every bronze feature was restored to its warm brown tone and maintained to the highest standard.
Our follow-up visits helped the hotel preserve its finishes for guests, keeping all visible metalwork consistent with Jumeirah Carlton Tower’s luxury presentation.
Unique Notes:
We coordinated closely with the hotel’s engineering team to schedule works discreetly and ensure all restored surfaces were ready for full operation.
Explore More of Our Projects
Discover additional examples of our bronze restoration and metal finishing work across London’s leading hotels here:







George Palmer Bronze Statue Restoration
Reading, Berkshire

Hotel Café Royal – Bronze Façade Restoration
London, England

Private Client Pewter Bathtub Finishing
Kensington, London















